Schedule of Condition cost: the short answer
A Schedule of Condition in London typically costs from a few hundred pounds for a small flat up to £1,500 or more for a large house or a complex commercial property. The exact figure depends on the size of the property, how many rooms and elevations need recording, the level of detail required, and how easy the property is to access. For most residential instructions in prime West and Central London, expect a fee somewhere in the £300 to £900 range, with larger or higher-value buildings sitting above that.
Because a Schedule of Condition is a preventative document, the fee is modest set against what it protects you from: a disputed dilapidations claim or a damage argument with a neighbour can run into many thousands of pounds. That balance is the whole point of commissioning one.
What is a Schedule of Condition?
A Schedule of Condition is a documented, usually photographic record of a property’s condition at a fixed point in time. A chartered surveyor inspects the building, notes the state of each relevant element (walls, ceilings, floors, joinery, decorations, external finishes and so on), and captures it in a written schedule supported by dated photographs.
The value of the document is that it fixes an agreed baseline. If a question arises later about who caused a crack, a stain or an area of wear, the schedule shows exactly how the property looked before the event in question. It is evidence, not opinion.
The main uses (and why they justify the cost)
There are two situations where a Schedule of Condition earns its fee many times over.
Protecting a neighbour’s property before adjacent works. When you carry out building work near a shared structure, a Schedule of Condition of the adjoining owner’s property records its state before your work starts. If the neighbour later claims your works caused damage, the schedule settles the question. This is closely tied to the Party Wall etc. Act 1996 process, and a clear pre-works record is one of the best protections a building owner can have. The government’s guidance on party walls and building work covers how that party wall process works.
A lease or dilapidations baseline. When a tenant takes on a commercial lease, a Schedule of Condition attached to the lease records the property’s condition at the start of the term. At lease end, it protects the tenant from being charged under a dilapidations claim for wear and defects that were already present on day one. Without it, a landlord’s schedule of dilapidations can hold the tenant responsible for the whole condition of the property, including pre-existing issues.
In both cases the document is inexpensive relative to the sums it can save. That is why the cost question is best read alongside the risk it removes.
What drives the cost
No two properties are the same, so the fee is quoted per instruction rather than from a fixed price list. The main factors are:
- Property size and type. A one-bedroom flat takes far less time to inspect and write up than a five-storey townhouse or a mixed-use commercial unit. More floor area means more to record.
- Number of rooms and elevations. The cost tends to track the number of spaces and external faces that need documenting. A detached building with four elevations involves more work than a mid-terrace flat.
- Level of detail required. A concise schedule for a small residential lease is lighter than a fully descriptive, room-by-room record with extensive photography for a high-value or contentious situation.
- Access. Difficult access (scaffolding, locked areas, tenanted rooms, roof spaces or restricted timing) adds time on site and to the report.
- Purpose. A party wall record and a lease schedule can differ in scope and presentation, which affects the time involved.
Two flats on the same street can therefore carry different fees, which is why a quick description of the property gives a far more accurate figure than any headline price.
Why it is worth it
The recurring theme with a Schedule of Condition is proportion. The fee is a one-off cost measured in hundreds of pounds. The disputes it prevents, a contested dilapidations claim at lease end, or an argument over cracking after a neighbour’s basement dig, are measured in thousands, plus the time, stress and professional fees of resolving them.
A clear, dated, professionally prepared record also carries weight if a matter reaches negotiation or a tribunal, precisely because it was made at the right moment and cannot be reconstructed later. You cannot go back and record a property’s original condition once work has started or a lease has ended, so the small cost buys something otherwise impossible to obtain. Our write-up of a Schedule of Condition in a Kensington mansion block shows how the document works in practice on a prime London property.
At the commercial end, the schedule of condition is the anchor document for dilapidations disputes: agreed at lease start, decisive at lease end.
How Ekron helps
Ekron is a firm of RICS Chartered Building Surveyors working across prime West and Central London. Every Schedule of Condition is inspected and prepared personally by a chartered surveyor, so the record is thorough, correctly scoped for its purpose, and ready to stand as evidence if it is ever needed. For a fee tailored to your specific property, tell us the address, size and reason for the schedule and we will provide a clear quote. Get in touch through our contact page to discuss your instruction.
Frequently asked questions
How much does a Schedule of Condition cost in London? It typically ranges from a few hundred pounds for a small flat to £1,500 or more for a large house or complex commercial property. Most prime London residential instructions fall in the £300 to £900 range, with the exact fee depending on size, detail and access. A quote based on the specific property is always more accurate than a headline figure.
What is a Schedule of Condition? It is a documented, usually photographic record of a property’s condition at a fixed point in time, prepared by a surveyor. It fixes an agreed baseline so that any later question about damage or wear can be checked against how the property looked beforehand.
Who pays for a Schedule of Condition? It depends on the purpose. In a party wall situation the building owner carrying out the works usually commissions and pays for it to record the neighbour’s property. For a commercial lease, the incoming tenant normally arranges one to protect themselves against future dilapidations claims.
How long does a Schedule of Condition take? The inspection itself usually takes a few hours depending on the size of the property, and the written schedule with photographs follows shortly after. The exact timing depends on the property and the level of detail required.
Is a Schedule of Condition worth the cost? For most people, yes. The fee is modest against the far larger sums involved in a disputed dilapidations claim or a damage argument with a neighbour, and the record cannot be created after the event, so it removes a much bigger risk for a small preventative cost.

“Every property tells a story. My job is to read it accurately and explain what it means for you, in plain English.”
Talk to a chartered surveyor.
Whether you are undertaking works or have been served notice, a short call is usually enough to set the right next step. Same working day, no charge, no obligation.