Skip to main content
Ekron / Services / Schedule of Condition
Service · Documented evidence

Schedule of Condition

A photographic and written record of a property’s condition at a defined point in time, prepared by an RICS Chartered Surveyor. Used in Party Wall matters, lease entry and exit, dilapidations and before works to a neighbouring property.

01 · What a Schedule of Condition is.

What a Schedule of Condition is.

A Schedule of Condition is a structured record of the condition of a building at the time of inspection. It is not a survey: it does not interpret defects or recommend repairs. It evidences exactly what was there, in what condition, on the date it was inspected.

Properly prepared, it is a defensible document. It is signed, dated, structured against a clear schedule of building elements, and supported by numbered photographs. Both parties to a future dispute can refer to it without ambiguity.

Format
PDF + photographs
Inspection
Half to full day
Turnaround
3–5 working days
Standard
RICS practice
02 · When you need one.

When you need one.

Party Wall matters

A Schedule of Condition records the relevant parts of an adjoining property before works commence, providing a baseline against which any subsequent allegation of damage can be assessed. This is common in Party Wall matters and can also be useful where neighbouring works fall outside the Act.

Lease commencement

For an incoming tenant, a Schedule of Condition can record the premises as found at the beginning of the lease. Where incorporated appropriately into the lease documentation, it can help define the condition in which the tenant is required to maintain or return the premises.

Dilapidations

A historic Schedule of Condition can become important evidence when assessing a tenant’s repairing obligations at lease expiry, by showing the condition of the premises at the start of the term. Dilapidations themselves remain governed by the terms of the lease.

Before construction

A Schedule of Condition can be prepared before works commence to record the condition of neighbouring buildings, retained areas or other property that could potentially be affected. This can help resolve later disagreements over whether damage was pre-existing.

03 · What’s included.

What’s included.

Structured schedule

Every accessible element, room by room and elevation by elevation.

Detailed photography

Each item photographed, numbered and cross-referenced to the schedule.

Plain-English description

Material, condition, defects visible at the date of inspection.

Signed & dated

Prepared and signed by an RICS Chartered Surveyor.

04 · How it works

How an instruction runs.

01

Access

We confirm access arrangements with the relevant parties.

02

Inspection

Half a day to a full day on site, depending on size.

03

Draft

A draft is shared within three to five working days.

04

Issue

Final signed PDF, suitable for service on the relevant parties.

Questions

Frequently asked.

Can a Schedule of Condition stop a dispute?

It cannot prevent one being raised, but it almost always shortens it. With an agreed baseline, both parties begin from the same evidence and the scope of the disagreement is much narrower.

Is photographic evidence enough on its own?

No. Photographs without a structured written schedule are easily challenged. The combination of both, signed and dated, is the document that holds up.

Evidence on the record, before it matters.

Tell us the property and why the schedule is needed. We confirm scope and timing the same working day.

Call 020 3951 1032 info@ekron.co.uk

Request a fixed-fee proposal